Capacity:ät: 12.000
m³/d Initial Investment:
approx. € 4.2 mil Completion:
2000 |
Service provided:
|
• |
New treatment plant and
pumping station incl. rehabilitation of the existing
buildings in acc. with the regulations of the authority
for the protection of historical monuments
|
• |
HOAI phases 1-9 for the
entire plant |
• |
Project management and site
supervision, commissioning and staff training |
Technology:
|
• |
Enclosed raw water aeration |
• |
2 stage enclosed filtration
(iron/manganese removal)
|
• |
GAC stage, chlorine disinfection |
• |
Sludge liquor treatment
in closed
|
• |
Clear water recirculation
with UV disinfection |
• |
Clear water pumping station,
output to service system 800 m³/h, H = 70 m
|
Construction works:
|
• |
Demolition of existing tanks,
pipelines and peripheral buildings |
• |
New underground piping system
|
• |
New building of filter hall
and sludge liquor storage
|
• |
Physical conversion of pumping
station and atomising building incl. interior works
(tiling etc.)
|
• |
Refurbishment of clear water
tank 2,500 m³
|
• |
ICA installations for fully-automated
operation with remote controlling
|
• |
External facilities, roads,
lighting system, security system, landscaping
|
• |
HVAC, sanitary, electrical
installations in all building structures |