High-water Overflow Sluice River Havel , Section Diemitz-Fleeth

Client:
Staatliches Amt für Umwelt und Natur Neubrandenburg Mecklenburg - Vorpommern

 


 


Completion:
2001
 

Service provided:

•

Engineering structures and traffic installations:Project engineering design HOAI phases 1-6

•

Structural design: HOAI phases 1-6
 

Technology:

•

Construction of a new movable sluice with a R.C. base as a high-water spillway in the upper river Havel region

•

Construction of a new 15-km-long intersecting structure in bolted pre-fabricated steel rubbing in an open pit with closed-circuit water management

•

Installation of galvanised sheet piling with accessible R.C. capping piece

•

Asphalting (roadway renewal in the building site area)