Project:
|
Repair and upgrading
of lock Güritz on Müritz-Elde-Kanalt |
Completion:
|
1999 |
Initial
Investment:
|
|
approx. € 0.7 mil
|
Service
provided: |
• |
Detailed engineering design of the structural
lock components, incl. the pertaining structural design
services
|
• |
Conceptual and detailed engineering
design of the road construction part incl. the pertaining
structural design services
|
• |
Stability verification of the angular
support elements in the road area
|
• |
Conceptual and detailed engineering
design of the lock external facilities
|
|
|