Capacity::
12.500 m³/d Initial
Investment: DM 14
mn Completion:
1994 |
Structural works:
|
• |
New building of filter hall
49 m x 18 m x 8 m and air dehumidification
|
• |
New building of secondary
functional building 25 m x 15 m, 2 storeys, offices,
lab, central control room, chlorine warehouse, heating
|
• |
Collection tank for sludge
liquor, V = 80 m3, D = 7 m |
• |
2 clear water tanks, incl.
gate valve tower, each 350 m3, above-ground, slopes
|
• |
Finanzielle Berechnungen
für die vorgeschlagenen Maßnahmen
|
• |
Connecting pipe work and
routing |
• |
Roads, green spaces, site
lighting and security
|
• |
E/ICA-system for fully-automated
operation and process control equipment and systems
|
Technological equipment::
|
• |
Closed aeration with oxidator
D = 3.5 m, air throughput max. 20 m³/h, air compressor
|
• |
2-stage enclosed filter
plant (iron and manganese removal), 2 parallel filters
per stage D = 4.5 m
|
• |
NaOH proportioning plant
for pH adjustment, max 600 l/d
|
• |
Disinfection with chlorine
gas, chlorine intake max. 260 g/h |
• |
Sludge liquor treatment
in collecting tank with dosed discharge to coagulation,
settling and belt filter plant
|
• |
Clear water pumpage with
2 pump batteries (3 pumps each 385 m³/h, H = 56
m, two pumps each 135 m³/h, H = 70 m) |
Scope of services: Complete
design (HOAI phases 1-9) and construction supervision
for plant technology, technological equipment, structural
works, E/ICA systems, roads and external facilities,
preparation of operation manuals and training courses
|