Water Works Großstöbnitz

New building of the water works with water treatment, clear water tanks, operation building

Client: 
Wasserversorgung und Abwasserbehandlung Leipzig GmbH, Saxony / Germany



Capacity::         
12.500 m³/d

Initial Investment:    
DM 14 mn

Completion:         
1994
 

Structural works:

New building of filter hall 49 m x 18 m x 8 m and air dehumidification

New building of secondary functional building 25 m x 15 m, 2 storeys, offices, lab, central control room, chlorine warehouse, heating

Collection tank for sludge liquor,
V = 80 m3, D = 7 m

2 clear water tanks, incl. gate valve tower, each 350 m3, above-ground, slopes

Finanzielle Berechnungen für die vorgeschlagenen Maßnahmen

Connecting pipe work and routing

Roads, green spaces, site lighting and security

E/ICA-system for fully-automated operation and process control equipment and systems
 

Technological equipment::

Closed aeration with oxidator D = 3.5 m, air throughput max. 20 m³/h, air compressor

2-stage enclosed filter plant (iron and manganese removal), 2 parallel filters per stage D = 4.5 m

NaOH proportioning plant for pH adjustment, max 600 l/d

Disinfection with chlorine gas, chlorine intake max. 260 g/h

Sludge liquor treatment in collecting tank with dosed discharge to coagulation, settling and belt filter plant

Clear water pumpage with 2 pump batteries (3 pumps each 385 m³/h, H = 56 m, two pumps each 135 m³/h, H = 70 m)
 

Scope of services:
Complete design (HOAI phases 1-9) and construction supervision for plant technology, technological equipment, structural works, E/ICA systems, roads and external facilities, preparation of operation manuals and training courses
 