Capex
Volume:
|
|
approx. € 20 mil
|
Area:
|
131 hectare
(96 hectare of industrial area), Brandenburg/Germany
|
Duration:
|
1994 - 1996
|
Scope
of services: |
• |
LP 1-9 (HOAI) and construction supervision
for all required media supply and traffic engineering
sites
|
• |
Project management for the complete
infrastructural development measure |
Technical
description of the site development |
Access and
site roads
|
• |
33,000 m2 roads aus Splittmastixasphalt
(Industriesammel- und Haupterschließungsstraßen) |
• |
4.300 m2 Fahrbahnen aus Asphaltbeton
(Erschließungsstraßen) |
• |
2,500 m2 parking areas
|
• |
11,200 m2 walk- and cycleways |
Sewerage system |
• |
Network: DN 200 - 250, Length =
3,620 m |
• |
Pumping station with cap. 50 m3/h |
• |
Pressure pipeline DN 200, Length = 7,500
m |
Storm-water
discharge and treatment system |
• |
Percolation tank with cap. 3,450 m3 |
• |
Network DN 300 – 1,200 / L = 3,870
m |
• |
Treatment plant with cap. 150 l/s
|
Water supply
system |
• |
Network DN 200, transportation main
L = 7,000 m from water works Erkner |
• |
Pressure booster station incl. storage
tank of 2 x 200 cm |
Street lighting |
• |
Connection to existing low-voltage station
|
• |
Light engineering calculations
|
Utility development
(electrical, gas supply, telecommunications)
|
Landscaping
|
Completion
of siding tracks |