Sccope
of services: |
Complete Engineering
incl. Structural Design, Site Supervision |
Duration: |
1991 bis 1993
|
The
project:
|
Within the reconstruction
of the river Elster weir at Plauen, the following conversions
were carried out:
|
• |
Conversion of the existing weir with
seven sluice boards into an inflatable weir with two
spreading areas (W = 12.95, H = 2.65 m), incl. fish
ladder |
• |
Rebuilding and rehabilitation of the
„Mühlgraben“ (ditch), L = 1.600 m |
• |
Rebuilding of the pedestrian bridges
in the city center area |
• |
Elaboration of an operation manual for
the plants.. |
Technical
Data:
|
• |
Inflatable Weir |
|
Height = 2,65 m
Two spreading areas of width = 12,95 m
MQ = 5,20 m3/s Fish ladder |
• |
"Ditch" Mühlgraben |
|
L = 1.600 m Q = 1,0 m3/s |