Project
period:
|
February 1998
– February 2000
|
Project description:
|
• |
Area in the south of Fischland
peninsula |
• |
Western sea dike facing
Baltic Sea, in east: insufficient flood protection system
to Saaler Bodden |
• |
Design of storm
tide protection to Saaler Bodden as well as connection
to western sea dike: |
• |
One basic variant,
three connection variants, new construction sections
as well as extension of the existing dike |
The project required a planning approval
procedure as defined in § 70 (4) LWaG [Land Water
Resources Act], incl. EIA for the pertaining dike and
dam structures |
Location of the planning area:
|
• |
In Landscape Protection
Area LSG „Boddenlandschaft", incl. stringent protection
zones
|
• |
Forms part of national wetland
area (FnB)
|
• |
Habitat of water fowl and
waders as defined in Ramsar Convention |
• |
South of FFH area „Vorpommersche
Boddenlandschaft"
|
EIA implementation:
|
• |
In view of the a/m protection
areas – highly sensitive planning area
|
• |
Determination, description
and evaluation of potential project impacts
|
• |
Studying and evaluation
of existing records and maps |
• |
Flora-related investigations |
• |
Identification of a preferred
project variant
|