Central WWTW Chemnitz-Heinersdorf

Client:
Entwδsserungsbetrieb der Stadt Chemnitz
 



Initial Investment:

approx. € 142 mil
 

Capacity:

1st extension phase 400.000 PE
final extension 640.000 PE (option)
 

Scope of services:

Construction of a new WWTW and demolition of existing buildings, tanks and shafts

•

HOAI phases 1-9 for the entire plant including stability verification, structural design, and landscape planning

•

Project management and site supervision

•

Planning and delivery of E/MSR-facilities

•

Sewage sludge disposal concept

•

ICommissioning
 

The first extension phase:

•

External development with a bridge across river Chemnitz

•

10,000 PE pilot plant

•

Stormwater treatment plant for 17,000 m³/h

•

Partial refurbishment and new building of a feeder flume with sediment trap and mechanical treatment stage

•

Refurbishment of 14,000 m³/h waste water pumping station

•

Biological waste water treatment with nitrification, upstream denitrification and biological phosphate removal

•

Blower station including building

•

Lime dosing station with acid capacity increase

•

Sludge treatment by anaerobic stabilization (mesophilic digestion), mechanical sludge dewatering and sludge drying

•

Sewage gas utilization in a combined heat power station

•

Biological and chemical exhaust air treatment
 

Buildings:

•

Preliminary sedimentation tanks - two double tanks, each 50.5 m x 18 m x max. 7 m

•

Denitrification tank: 41.4 m x 18.6 m x 7 m

•

Activation tanks - 3 double tanks, each 164 m x 35 m x 7 m

•

4 secondary sedimentation tanks, each D = 56 m, depth (hopper) = 12 m )

•

6 Thickener, each D = 14 m

•

Sludge liquor tank D = 16 m

•

3 distributor structures, max. 14 m x 14 m x 14 m x 6.1 m

•

3 stormwater settling tanks, each 46 m x 15 m x 4.3 m

•

Buildings for technical equipment

•

Operations building, garages, storage and laboratory building
 

Relevant business activities: